Capacity
Before you buy another machine, inspect the operating context.
Compare recorded production, ideal cycle time and scheduled time. Establish what that evidence can support before drawing a conclusion about capacity.
Synthetic demonstration. Customer uploads and scans are not available in this public preview.
THE SUPPORTED COMPARISON
What the records can show
Eligible records support output multiplied by ideal cycle time, compared with recorded scheduled minutes within each work-center and product group.
The report preserves the formula, source fields and coverage limitations. Repeated work-center and date records are flagged when their scope needs confirmation.
THE LIMITS OF THE ANSWER
What still needs confirmation
This comparison does not prove spare capacity, identify a system bottleneck or establish that another machine is needed. Routing, shared resources, demand and practical constraints require a separate investigation. No capacity savings estimate is supplied.
A scan may find no positive opportunity, or insufficient data for this comparison. Its conclusion applies to the eligible records and supported methods shown.
FROM EVIDENCE TO A NEXT CHECK
A useful next investigation
- Verify that ideal cycle time means time per output unit and that scheduled minutes match the production scope without duplicated exposure.
- Review routing, shared resources and demand with the people responsible for the process before making an equipment decision.
START WITH THE QUESTION ON YOUR FLOOR